Mercedes M-Class W163

since 1997 of release

Repair and car operation



Mercedes W163
+ Mercedes-Benz Cars of a class M (W163)
+ Governing bodies and receptions of safe operation
+ Current leaving and service
- Engine
   Check of kompressionny pressure in cylinders
   Engine check by means of the vacuum gage
   Replacement of a belt of a drive of auxiliary units and elements of the mechanism of its tension
   - Petrol models
      Removal and engine installation
      Removal and installation of covers of a drive of GRM
      Replacement of a gas-distributing chain
      Removal and installation of components of a drive of GRM
      Installation of base provision of camshafts
      Verification of the base provision of a balancing shaft (only series 112 engines)
      Removal and installation of GRM components
      Removal and head installation (ok) cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal and installation of a face cover, replacement of a back epiploon of a cranked shaft
      Removal and installation of a damper krutilny fluctuations/pulley of a driving belt
      Removal and flywheel installation / driving disk
      Removal and installation of support of a suspension bracket of the power unit
      Service of system of greasing
   + Diesel models
+ Systems of cooling, heating and air conditioner
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Avtomaticheckaya transmission
+ Transmission line
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of the inlet pipeline

Details of installation of the inlet pipeline of the engine of a series 111

19 — the Inlet pipeline
19/1 — the Fixing bolt
19/2 — Fixing nuts

19/3 — Sealing laying
32/4 — the Connecting rod
32/13 — the Bolt

М111

 PERFORMANCE ORDER

  1. Details of installation of the inlet pipeline of the engine of a series 111 are shown on an illustration which all references meeting in the text concern.
  2. Disconnect a negative wire from the battery.
  3. Remove a bypass pipe of an air purifier.
  4. Disconnect vacuum and electric lines.
  5. Remove the fuel highway assembled with injectors (see. Head of the Power supply system and production of the fulfilled gases).
  6. Liberate from intermediate clamps on the inlet pipeline engine electroconducting.
  7. Disconnect electroconducting from sensors of provision of a cranked shaft (CKP) and a detonation (KS).
  8. Disconnect from a starter a contour 50.
  9. Remove the actuation mechanism of system of stabilization of turns of idling (ISC).
  10. Separate from the inlet pipeline a cable of a drive of a butterfly valve.
  11. Release fixing bolts (19/1) and nuts (19/2) and remove assembly of the inlet pipeline (19).
  12. Installation is made upside-down.
  13. In summary check correctness of installation of turns of idling and serviceability of functioning of a drive of a butterfly valve.

M112/113

Details of installation of the inlet pipeline of engines of a series 112 and 113

The arrow Opening under installation of the combined valve


 PERFORMANCE ORDER

  1. Details of installation of the inlet pipeline of engines of series 112 and 113 are shown on an illustration which all references meeting in the text concern.
  2. On the models equipped with the electronic switch of ignition (EIS), take a key from the ignition lock.
  3. Remove an overlay of covers of heads cylinders/air purifier.
  4. Remove a sleeve of an inlet air path assembled with the sensor of weight of air (MAF).
  5. Disconnect from a toplivoraspredelitel submitting line (17/2).
  6. Remove the fuel highway assembled with injectors (see. Head of the Power supply system and production of the fulfilled gases).
  7. Turn out bolts (2/1) fastenings of a cover of a head of cylinders.
  8. Disconnect from the inlet pipeline (19) vacuum lines.
  9. Disunite electric sockets.
  10. Unscrew a shtutserny nut and disconnect the line (89/2) from the valve (89) of system of a retsirkulyatsiya of the fulfilled gases (EGR).
  11. Turn out a bolt (19/1) and remove assembly of the combined valve (6).
  12. Remove the inlet pipeline (19).
  13. Installation is made upside-down.